Rok | Oczyszczalnia | Zakres robót |
---|---|---|
2020-2021 | Mechanical-Biological Wastewater Treatment Plant in Dębno | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2019-2021 | Wastewater Treatment Plant in Korzyścienko | Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2020 | Wastewater Treatment Plant in the Resko Agglomeration | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2019-2020 | Wastewater Treatment Plant of MZK Sp. z o.o. in Kostrzyn nad Odrą | Modernization of Control System for Prototype Sewage Sludge Mineralization Installation |
2019 | Wastewater Treatment Plant in Widuchowa | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2018-2019 | Wastewater Treatment Plant in Myśliborz | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2017-2019 | Wastewater Treatment Plant in Unieście | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2018 | “Ostrów Grabowski” Wastewater Treatment Plant | Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2018 | Wastewater Treatment Plant in Kuchary | Implementation |
2017-2018 | Wastewater Treatment Plant in Mostkowo | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2017-2018 | Wastewater Treatment Plant in Rychnów | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2017-2018 | Wastewater Treatment Plant in Połczyn-Zdrój | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2017-2018 | Wastewater Treatment Plant in Trzebiatów | Project and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2009 | “Zdroje” Wastewater Treatment Plant for the Right-Bank Part of Szczecin | Realizacja |
2009 | Wastewater Treatment Plant in Barwice | Realizacja |
2008 | Wastewater Treatment Plant in Dąbrówka | Implementation |
2007 | Municipal Wastewater Treatment Plant in Kożuchów | Implementation |
2007 | Municipal Wastewater Treatment Plant in Dębno | Design |
2007 | Municipal Wastewater Treatment Plant in Zabierzewo | Design and implementation |
2006 | Municipal Wastewater Treatment Plant in Trzcianka | Design and implementation |
2006 | Municipal Wastewater Treatment Plant in Lubniewice | Design and implementation |
2002-2003 | Local Pumping Stations of the Kołbaskowo Municipality | Design and implementation |
2004 | Sewage Pumping System of the Przelewice Municipality | Design and implementation |
2004 | Wastewater Treatment Plant in Krzeszyce | Design and implementation |
2003 | Aeration System Design for Wastewater Treatment Plant and Sewer System in Drezdenko | Design and implementation |
2001 | Municipal Wastewater Treatment Plant in Strzelce Krajeńskie | Design and implementation |
2002 | Municipal Wastewater Treatment Plant in Dobiegniew | Design and implementation |
2001 | Local Pumping Stations for Wastewater Treatment Plant in Steklno | Design and implementation |
2001 | Wastewater Treatment Plant at the “Alpex Karlino” Chipboard Factory | Design |
2000 | Wastewater Treatment Plant in Rymań | Design and implementation |
2000 | Municipal Wastewater Treatment Plant in Brojce | Design and implementation |
1999 | Municipal Wastewater Treatment Plant in Komarowo | Design and implementation |
1998 | Municipal Wastewater Treatment Plant in Sulęcin | Design and implementation |
1998 | Municipal Wastewater Treatment Plant in Resko | Design and implementation |
1997 | Municipal Wastewater Treatment Plant in Międzywodzie | Design |
1997 | Pumping Stations P1 and P2 of the “H” Sewer Collector System in Szczecin-Dąbie | Design and implementation |
1997 | Municipal Wastewater Treatment Plant in Drezdenko | Design and implementation |
1997 | Municipal Wastewater Treatment Plant in Suchań | Design and implementation |
1996 | “POMORZANY” Wastewater Treatment Plant in Szczecin | Automation, Control, and Instrumentation and Electrical Design |
1996 | Municipal Wastewater Treatment Plant in Łobez | Automation, Control, and Instrumentation and Electrical Design |
1995 | “Zdroje” Wastewater Treatment Plant in Szczecin | Concept of Control and Supervision System |
1995 | Municipal Wastewater Treatment Plant in Choszczno | Design and implementation |
1995 | Municipal Wastewater Treatment Plant in Myślibórz | Design and implementation |
1994 | Municipal Wastewater Treatment Plant in Szczecinek | Design and implementation |
1993 | Municipal Wastewater Treatment Plant in Gryfice | Design |
1993 | Municipal Wastewater Treatment Plant in Nowe Warpno | Design |
Year | Water Management | Scope |
---|---|---|
2021 | Water Treatment Plant “Skolwin” at Plażowa Street 20 in Szczecin | Control System Modernization |
2020 | Pumping Station P-1 at “Miedwie” Water Production Plant | Design and Construction of a Diagonal Pump Efficiency Control System |
2020 | Water Treatment Stations in Grzybowa, Trzebież, and Sierakowo | Control System Modernization |
2019-2020 | Dispatch Center for PWiK Sp. z o.o. in Gorzów Wielkopolski | Expansion of SCADA Visualization System |
2019 | Water Treatment Plant in Niewiadowo, Goleniów Commune | Water Treatment Technology Construction with Electrical and Automation, Control, and Instrumentation Installation |
2019 | Water Treatment Station in Tanowo | Control System Modernization |
2019 | Water Treatment Station in Łazy | Implementation in the Field of Automation, Control, and Instrumentation |
2018-2019 | Water and Sewage Network Monitoring for PWiK Sp. z o.o. in Gorzów Wielkopolski | Expansion of Monitoring System |
2018 | Water Treatment Plant in Myśliborz | Design and Implementation in the Field of Electrical and Automation, Control, and Instrumentation |
2017-2018 | Telemetric System Construction Based on Hydraulic Model in the Right and Left-Bank Parts of Szczecin | Implementation in the Field of Automation, Control, and Instrumentation |
2017 | Delivery and Implementation of Zone Metering System for Water and Sewage Production and Distribution in Goleniów | Implementation in the Field of Automation, Control, and Instrumentation |
2017-2018 | Water Supply Network Management System in Szczecin | Construction of a Central Dispatch Center for the Water Supply and Sewerage Network for the Left and Right-Bank Parts of Szczecin |
2009 | Water Coagulation Installation in “Miedwie” Water Production Plant | Implementation |
2008 | Żelewo Water Pumping Station | Implementation |
2008 | PiA Installation for Drinking Water Pumping Station in Rychnowo (Barlinek Commune) with GPRS Data Transmission to Computer Network Monitoring System | Implementation |
2008 | “Szlamowa” Sewage Pumping Station | Implementation |
2007 | Sewage Pumping Stations in Dąbie, Szczecin | Implementation |
2007 | Filter Station with Activated Carbon Bed in “Miedwie” Water Production Plant | Implementation |
2007 | PiA Installation for “Dąbie” Water Pumping Station in Szczecin | Implementation |
2007 | PiA Installation for “Białowieska” Water Pumping Station in Szczecin | Implementation |
2006 | PiA Installation for Drinking Water Pumping Station in Lutówek (Barlinek Commune) with GPRS Data Transmission to Computer Network Monitoring System | Implementation |
2006 | Pump Control and Visualization System in Pumping Station P3 in “Pomorzany” Water Production Plant | Design and implementation |
2005 | Valve Control and Visualization System in Sluice Chamber in “Pomorzany” Water Production Plant | Design and implementation |
2005 | Water Network Treatment Station at Benesza Street in Szczecin | Realizacja |
2005 | Medium Voltage Substation Control and Visualization System at “Miedwie” Water Production Plant | Design and implementation |
2004 | Hydrophore Monitoring System at Klonowica Street in Szczecin with Radio Data Transmission to Computer Network Monitoring System | Implementation |
2004 | Hydrophore Modernization at Szafera Street in Szczecin with Radio Data Transmission to Computer Network Monitoring System | Design and implementation |
2003 | Sanitary Sewer System to Ostrów Grabowski Sewage Treatment Plant in Szczecin | Implementation |
2002 | Water Intake in Dębce | Design |
2001-2003 | Rapid Filter Modernization at “Miedwie” Water Treatment Plant | Implementation |
2001 | Water Pumping Station for Goleniów Airport | Implementation |
2000-2002 | Control System Installation Modernization at “Zdroje” in Szczecin | Implementation |
2000 | Aeration Control System for Drezdenko Sewage Treatment Plant | Design and implementation |
2000 | Water Supply Pipeline “WARSZEWO – MŚCIĘCINO” | Implementation |
1999 | Central Control and Monitoring Station for “WARSZEWO-MŚCIĘCINO” Water Supply Pipeline in Szczecin | Implementation |
1999 | P&A Installation for Drinking Water Pumping Station at Tatrzańska Street in Szczecin | Implementation |
1999 | Water Supply Pipeline “WARSZEWO – MŚCIĘCINO” – “WARSZEWO” Pumping Station PiA and Pumping Station Control and Visualization System | Implementation |
1999 | PiA Installation for Drinking Water Pumping Station in Kijewo (Szczecin) with Radio Data Transmission to Computer Network Monitoring System | Implementation |
1998 | P&A Installation for Drinking Water Pumping Station at Lechicka Street in Szczecin with Radio Data Transmission to Computer Network Monitoring System | Implementation |
1998 | P&A Installation for Drinking Water Pumping Station at Bandurskiego Street in Szczecin with Radio Data Transmission to Computer Network Monitoring System | Implementation |
1998 | “NIEBUSZEWO” Pumping Station in Szczecin | Design |
1997 | Water Pressure Stabilization, PiA Installation for Drinking Water Pumping Station at Bandurskiego Street in Szczecin | Technical design |
1996 | PiA Installation for Drinking Water Pumping Station in Płonia | Implementation |
1996 | “MŚCIĘCINO” Water Treatment Station | Design |
1995 | Aeration Control System for Kołobrzeg Sewage Treatment Plant | Design and implementation |
1995 | Aeration Control System for Przelewice Sewage Treatment Plant | Design and implementation |
1995 | Water Pressure Stabilization, PiA Installation for Drinking Water Pumping Station in Płonia | Design |
1993 | Water Intake in Kurów | Design |
1989 | “BIAŁY BÓR” Water Treatment Station | Design |
1989 | Brackish Water Desalination Installation using Reverse Osmosis | Automation and electrical design |
1987 | “CZYŻKÓWKO” Water Intake in Bydgoszcz | Automation and electrical design |
1987 | Measurement and Automation for “USTRONNA” Boiler House Water Treatment Station in Łódź | Automation design |
Rok | Energetyka cieplna | Zakres prac |
---|---|---|
2020 | “Dąbska” Heat Plant in Szczecin | Design and implementation in the field of Automation, Control, and Instrumentation for flue gas installations for boilers. |
2004 | Peak-Summer Heat Plant on Benesza Street in Szczecin | Implementation |
2002-2004 | “Tanowska” Heat Plant in Police | Design and implementation |
Boiler House at the Zdroje Hospital | ||
Boiler House at the “Załom” Football Club | ||
Boiler House at the Chipboard Factory in Żary | ||
Boiler House in Ostrołęka | ||
Combined Heat and Power Plant at the “WŁOCŁAWEK” Nitrogen Works | ||
Municipal Boiler House in Łomża | ||
Municipal Boiler House in Koszalin | Implementation |
Rok | Instalacja | Zakres prac |
---|---|---|
2020 | Power Station at CPŚ Sikorskiego Street 67 in Gorzów Wielkopolski | Implementation in the Field of Automation, Control, and Instrumentation |
2019 | Photovoltaic Installation for Goleniów Water and Sewage Company in Goleniów | Implementation in the Field of Automation, Control, and Instrumentation |
2018 | AZOTY POLICE Group | Dostawa i montaż w szafach 15 szt. softstartów i 14 szt. szt. przetwornic częstotliwości |
2017-2018 | Zalando Gryfino Logistics Center in Gardno | Implementation of Automation Systems for ventilation |
2008 | Production Control System for Polymer Concrete Products for “Irma” Company | Implementation |
2006 | Production Control System for Bioethanol Manufacturing in Ińsko | Design and implementation |
2004 | Control System for the State Fire Service in Police | Implementation |
2004 | Conveyor Belt Control Project for Biomass and Coal Combustion Optimization at Dolna Odra Power Plant | Design |
2004 | Monitoring System for Local Boiler Houses at SUW Miedwie | Design and implementation |
2003 | Starch Factory in Łobez | Design and implementation |
2003 | Automation of Ventilation and Air Conditioning System for DREWPOL Sp. z o.o. in Osino | Design and implementation |
2000 | Power Supply and Control of Cooling Fans in the Desulfurization Plant at Pomorzany Power Plant in Szczecin | Design and implementation |
1997-1999 | Dosage of Products for Polyurethane Foam Production at “Organika SA” Chemical Plants in Malbork – 3 Facilities | Design and implementation |
1998 | Vegetable Storage Facilities in the Donetsk Basin (Ukraine) – 7 Facilities | Design and implementation |