Projects

RokOczyszczalniaZakres robót
2020-2021Mechanical-Biological Wastewater Treatment Plant in DębnoProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2019-2021Wastewater Treatment Plant in KorzyścienkoImplementation in the Field of Electrical and Automation, Control, and Instrumentation
2020Wastewater Treatment Plant in the Resko AgglomerationProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2019-2020Wastewater Treatment Plant of MZK Sp. z o.o. in Kostrzyn nad OdrąModernization of Control System for Prototype Sewage Sludge Mineralization Installation
2019Wastewater Treatment Plant in WiduchowaProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2018-2019Wastewater Treatment Plant in MyśliborzProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2017-2019Wastewater Treatment Plant in UnieścieProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2018“Ostrów Grabowski” Wastewater Treatment PlantImplementation in the Field of Electrical and Automation, Control, and Instrumentation
2018Wastewater Treatment Plant in KucharyImplementation
2017-2018Wastewater Treatment Plant in MostkowoProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2017-2018Wastewater Treatment Plant in RychnówProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2017-2018Wastewater Treatment Plant in Połczyn-ZdrójProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2017-2018Wastewater Treatment Plant in TrzebiatówProject and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2009“Zdroje” Wastewater Treatment Plant for the Right-Bank Part of SzczecinRealizacja
2009Wastewater Treatment Plant in BarwiceRealizacja
2008Wastewater Treatment Plant in DąbrówkaImplementation
2007Municipal Wastewater Treatment Plant in KożuchówImplementation
2007Municipal Wastewater Treatment Plant in DębnoDesign
2007Municipal Wastewater Treatment Plant in ZabierzewoDesign and implementation
2006Municipal Wastewater Treatment Plant in TrzciankaDesign and implementation
2006Municipal Wastewater Treatment Plant in LubniewiceDesign and implementation
2002-2003Local Pumping Stations of the Kołbaskowo MunicipalityDesign and implementation
2004Sewage Pumping System of the Przelewice MunicipalityDesign and implementation
2004Wastewater Treatment Plant in KrzeszyceDesign and implementation
2003Aeration System Design for Wastewater Treatment Plant and Sewer System in DrezdenkoDesign and implementation
2001Municipal Wastewater Treatment Plant in Strzelce KrajeńskieDesign and implementation
2002Municipal Wastewater Treatment Plant in DobiegniewDesign and implementation
2001Local Pumping Stations for Wastewater Treatment Plant in SteklnoDesign and implementation
2001Wastewater Treatment Plant at the “Alpex Karlino” Chipboard FactoryDesign
2000Wastewater Treatment Plant in RymańDesign and implementation
2000Municipal Wastewater Treatment Plant in BrojceDesign and implementation
1999Municipal Wastewater Treatment Plant in KomarowoDesign and implementation
1998Municipal Wastewater Treatment Plant in SulęcinDesign and implementation
1998Municipal Wastewater Treatment Plant in ReskoDesign and implementation
1997Municipal Wastewater Treatment Plant in MiędzywodzieDesign
1997Pumping Stations P1 and P2 of the “H” Sewer Collector System in Szczecin-DąbieDesign and implementation
1997Municipal Wastewater Treatment Plant in DrezdenkoDesign and implementation
1997Municipal Wastewater Treatment Plant in SuchańDesign and implementation
1996“POMORZANY” Wastewater Treatment Plant in SzczecinAutomation, Control, and Instrumentation and Electrical Design
1996Municipal Wastewater Treatment Plant in ŁobezAutomation, Control, and Instrumentation and Electrical Design
1995“Zdroje” Wastewater Treatment Plant in SzczecinConcept of Control and Supervision System
1995Municipal Wastewater Treatment Plant in ChoszcznoDesign and implementation
1995Municipal Wastewater Treatment Plant in MyślibórzDesign and implementation
1994Municipal Wastewater Treatment Plant in SzczecinekDesign and implementation
1993Municipal Wastewater Treatment Plant in GryficeDesign
1993Municipal Wastewater Treatment Plant in Nowe WarpnoDesign
YearWater ManagementScope
2021Water Treatment Plant “Skolwin” at Plażowa Street 20 in SzczecinControl System Modernization
2020Pumping Station P-1 at “Miedwie” Water Production PlantDesign and Construction of a Diagonal Pump Efficiency Control System
2020Water Treatment Stations in Grzybowa, Trzebież, and SierakowoControl System Modernization
2019-2020Dispatch Center for PWiK Sp. z o.o. in Gorzów WielkopolskiExpansion of SCADA Visualization System
2019Water Treatment Plant in Niewiadowo, Goleniów CommuneWater Treatment Technology Construction with Electrical and Automation, Control, and Instrumentation Installation
2019Water Treatment Station in TanowoControl System Modernization
2019Water Treatment Station in ŁazyImplementation in the Field of Automation, Control, and Instrumentation
2018-2019Water and Sewage Network Monitoring for PWiK Sp. z o.o. in Gorzów WielkopolskiExpansion of Monitoring System
2018Water Treatment Plant in MyśliborzDesign and Implementation in the Field of Electrical and Automation, Control, and Instrumentation
2017-2018Telemetric System Construction Based on Hydraulic Model in the Right and Left-Bank Parts of SzczecinImplementation in the Field of Automation, Control, and Instrumentation
2017Delivery and Implementation of Zone Metering System for Water and Sewage Production and Distribution in GoleniówImplementation in the Field of Automation, Control, and Instrumentation
2017-2018Water Supply Network Management System in SzczecinConstruction of a Central Dispatch Center for the Water Supply and Sewerage Network for the Left and Right-Bank Parts of Szczecin
2009Water Coagulation Installation in “Miedwie” Water Production PlantImplementation
2008Żelewo Water Pumping StationImplementation
2008PiA Installation for Drinking Water Pumping Station in Rychnowo (Barlinek Commune) with GPRS Data Transmission to Computer Network Monitoring SystemImplementation
2008“Szlamowa” Sewage Pumping StationImplementation
2007Sewage Pumping Stations in Dąbie, SzczecinImplementation
2007Filter Station with Activated Carbon Bed in “Miedwie” Water Production PlantImplementation
2007PiA Installation for “Dąbie” Water Pumping Station in SzczecinImplementation
2007PiA Installation for “Białowieska” Water Pumping Station in SzczecinImplementation
2006PiA Installation for Drinking Water Pumping Station in Lutówek (Barlinek Commune) with GPRS Data Transmission to Computer Network Monitoring SystemImplementation
2006Pump Control and Visualization System in Pumping Station P3 in “Pomorzany” Water Production PlantDesign and implementation
2005Valve Control and Visualization System in Sluice Chamber in “Pomorzany” Water Production PlantDesign and implementation
2005Water Network Treatment Station at Benesza Street in SzczecinRealizacja
2005Medium Voltage Substation Control and Visualization System at “Miedwie” Water Production PlantDesign and implementation
2004Hydrophore Monitoring System at Klonowica Street in Szczecin with Radio Data Transmission to Computer Network Monitoring SystemImplementation
2004Hydrophore Modernization at Szafera Street in Szczecin with Radio Data Transmission to Computer Network Monitoring SystemDesign and implementation
2003Sanitary Sewer System to Ostrów Grabowski Sewage Treatment Plant in SzczecinImplementation
2002Water Intake in DębceDesign
2001-2003Rapid Filter Modernization at “Miedwie” Water Treatment PlantImplementation
2001Water Pumping Station for Goleniów AirportImplementation
2000-2002Control System Installation Modernization at “Zdroje” in SzczecinImplementation
2000Aeration Control System for Drezdenko Sewage Treatment PlantDesign and implementation
2000Water Supply Pipeline “WARSZEWO – MŚCIĘCINO”Implementation
1999Central Control and Monitoring Station for “WARSZEWO-MŚCIĘCINO” Water Supply Pipeline in SzczecinImplementation
1999P&A Installation for Drinking Water Pumping Station at Tatrzańska Street in SzczecinImplementation
1999Water Supply Pipeline “WARSZEWO – MŚCIĘCINO” – “WARSZEWO” Pumping Station PiA and Pumping Station Control and Visualization SystemImplementation
 1999PiA Installation for Drinking Water Pumping Station in Kijewo (Szczecin) with Radio Data Transmission to Computer Network Monitoring SystemImplementation
1998P&A Installation for Drinking Water Pumping Station at Lechicka Street in Szczecin with Radio Data Transmission to Computer Network Monitoring SystemImplementation
1998P&A Installation for Drinking Water Pumping Station at Bandurskiego Street in Szczecin with Radio Data Transmission to Computer Network Monitoring SystemImplementation
1998“NIEBUSZEWO” Pumping Station in SzczecinDesign
1997Water Pressure Stabilization, PiA Installation for Drinking Water Pumping Station at Bandurskiego Street in SzczecinTechnical design
1996PiA Installation for Drinking Water Pumping Station in PłoniaImplementation
1996“MŚCIĘCINO” Water Treatment StationDesign
1995Aeration Control System for Kołobrzeg Sewage Treatment PlantDesign and implementation
1995Aeration Control System for Przelewice Sewage Treatment PlantDesign and implementation
1995Water Pressure Stabilization, PiA Installation for Drinking Water Pumping Station in PłoniaDesign
1993Water Intake in KurówDesign
1989“BIAŁY BÓR” Water Treatment StationDesign
1989Brackish Water Desalination Installation using Reverse OsmosisAutomation and electrical design
1987“CZYŻKÓWKO” Water Intake in BydgoszczAutomation and electrical design
1987Measurement and Automation for “USTRONNA” Boiler House Water Treatment Station in ŁódźAutomation design
RokEnergetyka cieplnaZakres prac
2020“Dąbska” Heat Plant in SzczecinDesign and implementation in the field of Automation, Control, and Instrumentation for flue gas installations for boilers.
2004Peak-Summer Heat Plant on Benesza Street in SzczecinImplementation
2002-2004“Tanowska” Heat Plant in PoliceDesign and implementation
 Boiler House at the Zdroje Hospital 
 Boiler House at the “Załom” Football Club 
 Boiler House at the Chipboard Factory in Żary 
 Boiler House in Ostrołęka 
 Combined Heat and Power Plant at the “WŁOCŁAWEK” Nitrogen Works 
 Municipal Boiler House in Łomża 
 Municipal Boiler House in KoszalinImplementation
RokInstalacjaZakres prac
2020Power Station at CPŚ Sikorskiego Street 67 in Gorzów WielkopolskiImplementation in the Field of Automation, Control, and Instrumentation
2019Photovoltaic Installation for Goleniów Water and Sewage Company in GoleniówImplementation in the Field of Automation, Control, and Instrumentation
2018AZOTY POLICE GroupDostawa i montaż w szafach 15 szt. softstartów i 14 szt. szt. przetwornic częstotliwości
2017-2018Zalando Gryfino Logistics Center in GardnoImplementation of Automation Systems for ventilation
2008Production Control System for Polymer Concrete Products for “Irma” CompanyImplementation
2006Production Control System for Bioethanol Manufacturing in IńskoDesign and implementation
2004Control System for the State Fire Service in PoliceImplementation
2004Conveyor Belt Control Project for Biomass and Coal Combustion Optimization at Dolna Odra Power PlantDesign
2004Monitoring System for Local Boiler Houses at SUW MiedwieDesign and implementation
2003Starch Factory in ŁobezDesign and implementation
2003Automation of Ventilation and Air Conditioning System for DREWPOL Sp. z o.o. in OsinoDesign and implementation
2000Power Supply and Control of Cooling Fans in the Desulfurization Plant at Pomorzany Power Plant in SzczecinDesign and implementation
1997-1999Dosage of Products for Polyurethane Foam Production at “Organika SA” Chemical Plants in Malbork – 3 FacilitiesDesign and implementation
 1998Vegetable Storage Facilities in the Donetsk Basin (Ukraine) – 7 FacilitiesDesign and implementation